5 kw Flyline Ongrid Solar System | Pattimattom | Murickens Group | Solar Power Plant | MG | Flyline

 5 kw Flyline Ongrid Solar System | Pattimattom | Murickens Group | Solar Power Plant | MG | Flyline

Murickans

On-Grid Solar Power Plant

The below video describes Murickans Group installed 5 KW on-grid solar inverter at pattimttom, Ernakulam

Murickens Group is an ISO 9001:2015 certified and MNRE approved manufacturer of Solar Power generation systems and Electronic items. we always concentrating on this power convert sun energy into electrical energy by developing some of the conversion equipment’s like MG Solar Water Heaters, Flyline Solar Inverters, Flyline Solar DC Street Light System, Solar UPS, Solar Lantern etc. and have already installed thousands of fully automatic smaller and bigger solar power units all over India since 2000. As we all know Sun is the Master Power of Energy but nobody is taking pain to think about the entire power of the Sun which has a direct involvement in the day-to-day affairs of every living thing and to be more precise we can convert different kinds of energy of the sunlight or sunrays for our day to day use. we use only the most modern technology available in the world for the manufacturing of solar power plants and arrange Ministry of New Renewable Energy (MNRE) subsidies for the solar products.

A grid-tie inverter converts direct current (DC) generated by Solar Panel into an alternating current (AC) suitable for injecting into an electrical power grid. On Grid inverters with their key advantage of eliminating battery initial and recurring expenses made a fast decision to go for ON GRID inverters. In the new scheme the individual household solar plants will give the KSEB board the excess electricity produced from the Flyline solar plant and in return the KSEB will pay you money. It will be possible by the installation of a new KSEB meter which will be provided by the KSEB, when you apply for the approval of solar plants at home.There will not be any storage in this system so no batteries. In the morning if the electricity produced in the panels are excess the KSEB meter will reverse and take the excess electricity to the line and if the current produced in the panel is less, the meter will provide the current, needed by reversing the meter. Murickens Group providing on site installations and commissioning of these units all over Kerala up to 100 KVA

INSTALLATION PROCEEDINGS:-
  1. Apply for Feasibility certificate from concerned electrical section office.
  2. Installation jobs.
  3. Apply to Inspection dept. of KSEB.
  4. Commissioning of the Power Plant


                                                          More Details:www.murickans.com

Comments

Popular posts from this blog

ഇലക്ട്രിസിറ്റി വേണ്ട, മുഴുവനായും സോളാറിൽ പ്രവർത്തിക്കുന്ന വീട് | Solar Home | Murickens Group | MG

6kva Flyline Solar Standalone Inverter Upgraded to 8 kva Solar Power Plant | Pala | Murickens Group

8kw Flyline Solar on-grid system at Ernakulam | Murickens Group | Solar powerplant Installation | MG